Level 1 readiness

Scoping CMMC and CPCSC Level 1 for small manufacturers

How a small machine shop or manufacturer can draw a clear Level 1 boundary (people, systems, shop-floor devices, cloud services and facilities) without putting the whole business in scope.

Scope is the boundary around everything that handles contract information: FCI for CMMC Level 1, specified information for CPCSC Level 1. Everything inside must meet the requirements. Everything outside doesn’t, as long as you can show it is genuinely outside. Good scoping is the single biggest lever on effort and cost.

Step 1: List where contract information goes

Trace a real order from arrival to shipment:

  • Arrives: email, supplier portal, file-share link, USB, paper.
  • Stored: Microsoft 365 or Google Workspace, a file server, ERP, local drives.
  • Used: engineering workstations, CAM software, CNC or CMM controllers, printers and plotters.
  • Leaves: quotes, inspection reports, shipping documents.

Step 2: Build the asset list

For each step, list the people, devices, applications, cloud services, and locations involved. Include the things people forget: shared shop-floor PCs, the office multifunction printer (it stores scans), personal phones used for email, and remote-access tools your IT provider uses.

Step 3: Draw the boundary, and shrink it

Ask what you can take out of scope:

  • Consolidate storage. Keep contract files in one managed location instead of on every laptop.
  • Limit who handles it. Not everyone in the company needs access to drawings and POs.
  • Separate the shop floor where you can. If machine controllers only receive programs from one engineering PC, document that path; consider network separation.
  • Stop the leaks. No contract files in personal email or personal cloud storage.

Step 4: Document it simply

Both programs expect you to be able to explain your scope. A good Level 1 scope package for a small supplier is:

  1. A one-page scope statement: what information, which systems, which locations, and why other systems are out of scope.
  2. A simple network diagram: internet, firewall, office network, any shop-floor segment, cloud services.
  3. An asset list: users, devices, applications, and services in scope.

The Government of Canada’s guidance specifically suggests keeping a scoping rationale and a simple network diagram for CPCSC Level 1.

Common scoping mistakes

  • Forgetting the MSP. Tools your IT provider uses to manage in-scope machines matter; see working with your MSP.
  • Ignoring paper and media. Printouts, USB keys, and old drives are in scope for media protection.
  • Scoping once. New machines, staff, and cloud apps change scope; review it at least annually.

If you don’t yet have a reliable asset list, start with an IT Foundation Sprint; if you need the boundary, responsibilities, and costs defined, that is the Compliance Clarity Sprint.

Sources

Requirements and timelines change. Check the official sources above before making compliance decisions. This article is general guidance, not legal advice.

Sushant Katare, CISSP, CCP, CCA

Founder of DT Cyber Consulting. 15+ years in cybersecurity, risk and compliance; works with U.S. and Canadian defence suppliers on CMMC and CPCSC readiness. Certified CMMC Professional (CCP) and Certified CMMC Assessor (CCA).

Talk it through

Not sure what applies to you?

A short discovery call can clarify your obligations and the most useful next step.

Book a discovery call